Ronald Killeen & Associates
Welcome! PDF Print E-mail
Written by Ron K Snr   
Saturday, 05 September 2009 05:53

Ronald Killeen & Associates is a professional Health & Safety consultancy providing plant and equipment inspections, reports, audits and maintenance to Australian industry.

Read more...
 
Tube Failure: D-Type WTB PDF Print E-mail
Written by Ron K Snr   
Friday, 04 September 2009 15:45

 

Industry Advice

16th September 2007

Following the failure of a tube in a four year old, 3 MW water tube boiler the following is drawn to your attention.

The rear D tube was found to have developed transverse cracking externally at the weld to the sealing strip in the furnace chamber between the rear wall tubes and the D tube.  This has occurred at both the top and bottom of the D tube in five (3 top—2 bottom) places.  A subsequent inspection, indications of cracking were detected in the tube at each of the transverse welds on the sealing strip and beginning to propagate into the D tube.

 

Last Updated on Friday, 04 September 2009 16:06
Read more...
 
Water Tube Boilers PDF Print E-mail
Written by Ron K Snr   
Friday, 04 September 2009 15:30

Ronald Killeen & Associates specialises in all types of Water Tube Boilers.

We can arrange for annual OH&SA inspections - click "About Us" for contact details.

Last Updated on Friday, 04 September 2009 15:39
 
Fire Tube Boilers PDF Print E-mail
Written by Ron K Snr   
Friday, 04 September 2009 15:30

Ronald Killeen & Associates specialises in all types of Fire Tube Boilers, from industrial plant right through to steam locomotives.

We can arrange for annual OH&SA inspections - click "About Us" for contact details.